The Result will undergo several steps before you get credit: The result file needs to be uploaded, the Result needs to be reported (you can initiate this manually by telling the client to "update project", otherwise it will decide by itself when it's time to do so, at latest 24h before the deadline). Then the Result needs to be "validated", i.e. compared to other Results for the same Workunit, so youl'll have to wait until they have come back to the server, too. If your Result then is considered to be "valid", i.e. agrees with them, you will be assigned credit.
BM
